My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/09/29 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/09/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:34:41 AM
Creation date
4/26/2017 8:33:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 1 <br /> Change Order#1 with KLB 9-29-10 Briefing COUNCIL BILL# <br /> Construction Inc for the Everett Proposed Action Originating Department Engineering/PS <br /> Riverfront Surcharge Phase 3 Consent Contact Person - Tim Marks <br /> Project 10-6-10 Action Phone Number 425-257-8872 <br /> First Reading FOR AGENDA OF 9-29-10 <br /> 10-6-10 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA • <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> GTS Drywall site on 36th 3-31-10 call for bids Change Order#1 <br /> street 6-2-10 Award <br /> Amount Budgeted $3,980,048.00 <br /> Expenditure Required $200,889.83 Account Number(s): 115-5-710-000-410 <br /> Budget Remaining $1,061,946.62 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Everett Riverfront Surcharge Phase 3 project included a Bid Schedule B. Schedule B covered a scope of <br /> work to remove contaminated soil from the GTS Drywall site. At the time of bid,the engineer's estimate of <br /> the quantity of contaminated soil to be removed from the project site was 6000 tons. The estimated quantity <br /> was based on a limited number of soil borings. The actual quantity of contaminated soil that was excavated, <br /> tested and then removed from the site was 10,306.32 tons. The estimated quantity of the bid item 7 in <br /> Schedule B needs to be increased to 10,606.23 tons and the total amount for bid item 7 in Schedule B needs <br /> to be increased to $480,789.83. This change increases the contract value by$200,889.83. As a result of this <br /> change order the contract price will increase from$2,717,211.55 to $2,918,101.38. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#1 with KLB Construction,Inc. for Everett Riverfront Surcharge <br /> Phase 3 Project in the amount of$200,889.83. <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.