My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/10/06 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/10/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:45:03 AM
Creation date
4/26/2017 8:44:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Leh y <br /> rte` <br /> AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN <br /> THE CITY OF EVERETT <br /> AND <br /> PERTEET, INC. <br /> The City and Perteet Inc. agree to amend and modify their professional services agreement dated <br /> September 16, 2009 (the "Agreement") as follows: <br /> WHEREAS, Perteet Inc. and the City entered into an Agreement dated September 16, 2009 to provide <br /> engineering services for the General Engineering and Consulting (GEC) Management, Rucker& Hoyt <br /> Avenue Streetscape Improvements, and <br /> NOW THEREFORE, the City of Everett and Perteet Inc. agree to amend and modify the Agreement as <br /> follows: <br /> 1. Modify Paragraph Paragraph 3 "Time of Beginning and Completion of Performance" as follows: <br /> This Agreement shall commence as of the date of execution of this Agreement and shall be <br /> completed by December 31, 2011. <br /> 2. Delete Paragraph 4.c "Compensation" and replace with the following: <br /> C. Total compensation, including all services of the Contractor and its subcontractors, <br /> subconsultants, and agents and their expenses, shall not exceed a maximum of One Million, <br /> Three Hundred Six Thousand Dollars ($1,306,000). The rates for such services are <br /> attached as Exhibit A. The fees anticipated for Work on the following City Tasks are as <br /> follows: <br /> -� �,ts M1Y b•���1�3 �rt7 'x.>�� k� :kt �3 t32�t t� � �z r � ��c '� ��} t i�.av�G�.��.��a�F '��C 3`z y�r: <br /> ,, 1 ,. t t ,, i 3� g Maximp n ompe s�tionG.,^. <br /> �,tya.',.k �k�a�.. t�3�.as5� �. ����7�$li'!a`�� x 4�ti., �.,. ,e� v"�?:*a«t x�. a t.,.,�,.x.,,�. . <br /> Task One: GEC Management $ 63,000 <br /> Task Two: Preliminary Roadway Design $ 130,000 <br /> Task Three: Preliminary Utility Design $ 72,500 <br /> Task Four: Public Involvement/Urban Design $ 139,000 <br /> Task Five: Level One Site Assessment $ 25,000 <br /> Task Six: Final Roadway Design $ 499,000 <br /> Task Seven: Final Utility Design $ 102,500 <br /> Task Eight: Other $ 129,000 <br /> Task Nine: Construction Support $ 146,000 <br /> Contract Maximum $1,306,000 <br /> All terms, conditions and provisions of the Agreement remain in full force and effect except as <br /> expressly modified by this Amendment. <br /> 2 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.