My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/11/03 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/11/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:41:08 AM
Creation date
4/26/2017 9:39:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 5 <br /> City of Everett Exhibit A— Scope of Work <br /> Water Main Replacement K October 5, 2010 <br /> UP No. 3443 Page 4 of 9 <br /> Deliverables: <br /> • Two hard copies of draft soils report for review by City <br /> • Two hard copies and one electronic copyy of final soils report <br /> E. Preliminary Design <br /> 1. Collect and review data provided by the City, including GIS and mapping data, <br /> record plans, and electronic templates. <br /> 2. Check for potential utility conflicts based on utility field locates, utility as-built <br /> drawings, and survey information. <br /> 3. Perform hydraulic modeling analysis to determine/verify proposed pipe sizes. <br /> Assumes one meeting with City to discuss model parameters,fire flow <br /> requirements, etc. and up to three visits to City to perform modeling using City's <br /> model and computer station. One additional meeting is included to discuss the <br /> findings of the modeling effort. <br /> 4. Prepare pre-design report including identification of required easements, if any, <br /> summary of modeling results and recommended pipe sizes and alignments, <br /> summary of cost projections (see following subtask), preliminary construction <br /> schedule, and exhibits for WSDOT franchise application north of Cascade View <br /> and east of 3rd Street SE. <br /> 5. Prepare 30% Opinion of Probable Construction Cost (OPCC) for inclusion in pre- <br /> design report. <br /> 6. Prepare 30% Design Drawings. These drawings will include the complete base <br /> map, proposed horizontal alignments, and plan and profile sheets only <br /> (estimated at 25 sheets). <br /> 7. Internal QA/QC <br /> 8. Prepare preliminary design submittal for City. <br /> 9. Attend 30%design review meeting with City. <br /> Deliverables: <br /> • Six hard-copies of preliminary Drawings (11" x 17" size) <br /> • Electronic base map and CAD files, in AutoCAD 2010 format and conforming <br /> to City CAD standards <br /> • Design report (entire report in pdf format, in addition to all files in their original <br /> source programs—Word, Excel, Microsoft Project, etc.). <br /> 179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.