Laserfiche WebLink
7r <br /> tvEnnOrtUbiltdii,40MAIVOKOW$Mt <br /> PROJECT TITLE: 3 • <br /> Professional Services 11/10/10 Briefing COUNCIL BILL# <br /> Agreement with Otak for Phase Proposed Action • Originating Department Public Works <br /> I of the City of Everett Surface Consent Contact Person Heather Griffin <br /> Water Comprehensive Plan 11/17/10 Action Phone Number 425-257-7206 <br /> First Reading FOR AGENDA OF 11/10/10 <br /> Second Reading 11/17/10 <br /> Third Reading Initialed by: <br /> Public Hearing Department Head <br /> Budget Advisory CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Two Drainage Basins in Authorize Advertisement Professional Services Public Works <br /> Everett for Qualifications 5/5/10 Agreement <br /> Amount Budgeted $270,000 <br /> Expenditure Required $270,000 Account Number(s): UP3393 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City has drainage basins where stormwater runoff is handled in separate pipelines from sanitary sewer <br /> flows. Typically stormwater is directed to a nearby receiving water body. There are three watersheds within <br /> the City: the Port Gardner Bay Watershed,the Lake Washington Watershed and the Snohomish River <br /> Watershed. Basins within each watershed are defined by streams, creeks, or lakes that discharge to these <br /> receiving waters. <br /> The City of Everett's original basin plans were completed 25 years ago. During those 25 years,the City has <br /> annexed new areas,and regulations have changed significantly,resulting in limitations on how the originally <br /> proposed capital improvements can be implemented. In recent years,the City,as a Phase II community,was <br /> issued a Municipal Storm Sewer System(MS4)National Pollutant Discharge Elimination System(NPDES) <br /> permit. It is anticipated that additional requirements will be imposed through these permits. The City is <br /> embarking on a three-year effort to replace the outdated basin plans and produce a Surface Water <br /> Comprehensive Plan that will present a prioritized list of capital improvement projects and programs. The <br /> projects will have descriptions and cost estimates suitable for submittal for grant and funding applications. <br /> Phase 1 of the work entails data collection,reconnaissance, and analysis for two pilot basins: one basin in the <br /> high-gradient Port Gardner watershed and a second basin in the low-gradient Lake Washington watershed. << <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign the Professional Services Agreement with Otak for Phase I of the City of <br /> Everett Surface Water Comprehensive Plan in the amount of$270,000. <br /> 11 <br />