Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> DESIGN & CONSTRUCTION SUPPORT SERVICES <br /> CITY OF EVERETT_PUBLIC WORKS <br /> A. INTRODUCTION <br /> Provide design review and construction support services to City of Everett Public Works <br /> Department for Water Filtration Plant and Water Pollution Control Facility Expansion Projects. <br /> B. DESIGN PERIOD SUPPORT <br /> Task 1 -Design Development Support <br /> 1.1 Design Engineer/City of Everett Design Development Meetings. Coordinate, <br /> attend and document project development meetings. <br /> 1.2 Permit tracking. Track communications with permit acquisition team, provide <br /> documentation assistance, and facilitate progress. <br /> 1.3 Design support. Establish and maintain necessary communications with design <br /> engineer for the WPCF so as to provide information needed from the City of <br /> Everett to maintain design progress. <br /> 1.4 Monitor design schedule. Review the design schedule and monitor progress. <br /> Facilitate design schedule revisions as necessary. <br /> Task 2—Review Design Documents <br /> 2.1 Design Submittal Review. Review design submittals at each phase(e.g., 30%, <br /> 60%, 90%, 99% and Final Design), document review documents for coordination, <br /> consistency and for City of Everett intent. <br /> 2.2 Plans Review. Review drawings submittals for constructability and completeness. <br /> Provide documentation of noted inconsistencies, lack of detail and/or coordination <br /> between plan, profile and detail drawings, including notes,tables and diagrams. <br /> 2.3 Specifications Review. Review project specifications for constructability, completeness, <br /> and coordination with project drawings. Provide documentation of noted inconsistencies, <br /> lack of information, misinformation, and coordination between specification sections and <br /> between specification and contract drawings. <br /> Page 1 of 5 <br /> 16 <br />