My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> Exhibit A—Description of Changed Work <br /> Change Order#1 <br /> Create New"Bid Item#8—entitled, "Change Order#1", in the lump sum amount of$32,030.27, <br /> which shall incorporate Work Change Directives 01, 02, 03, 04, 05 and 06 per the following: <br /> Work Change Directive WCD-01 — Stellar J to meet ARRA funding requirements including Buy <br /> America and Davis-Bacon provisions. Increase the Contract Amount by$2,362.50. <br /> Work Change Directive WCD-02—Provide concrete, reinforcing and anchor bolts for the Recovered <br /> Water Pump Station metal building. Increase the Contract Amount by$9,726.11. <br /> Work Change Directive WCD-03 —Provide and install at the Recovered Water Pump Station a 12"x <br /> 91-3/8" ductile iron riser pipe and blind flange. Increase the Contract Amount by$9,196.45. <br /> Work Change Directive WCD-04—Revise the City of Everett Lake Chaplain Reservoir Equipment <br /> Decontamination Policy. Increase the Contract Amount by$1,341.43. <br /> Work Change Directive WCD-05 —Install a process floor drain similar to the attached Zurn ZR15 4- <br /> inch diameter and 4-inch cast iron soil pipe from the drain to a point where the pipe daylights. Install a <br /> stainless steel rodent mesh over the open end of the pipe. Increase the Contract Amount by$5,311.34. <br /> Work Change Directive WCD-06—Provide a Hydroflo Model 16MH—2 Stage as an alternate to the <br /> specified vertical turbine pump. Increase the Contract Amount by$4,092.44. Increase the Contract <br /> Duration by 30 calendar days. <br /> JUSTIFICATION: <br /> Work Change Directive WCD-01 —City of Everett is accepting ARRA funding. <br /> Work Change Directive WCD-02—Provide required anchorage designed for the submitted Recovered <br /> Water Pump Station metal building. <br /> Work Change Directive WCD-03 —Extend future piping above grade prior to constructing a building <br /> that would limit access to doing this work. <br /> Work Change Directive WCD-04—Decontamination procedures had to be changed due to the <br /> appearance of the New Zealand mud snail in waters in Washington and surrounding states. <br /> Work Change Directive WCD-05 —Drain water from the air release blow offs. <br /> Work Change Directive WCD-06— Specified pump models did not meet all specification <br /> requirements. Procurement of pumps was delayed during submittal review of the specified pumps. <br /> 168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.