Laserfiche WebLink
16 <br /> PROJECT: Water Filtration Facility — <br /> Lake Chaplain Recovered Water Outfall Improvements Project <br /> WO# UP-3347 <br /> WORK CHANGE DIRECTIVE - No 02 <br /> DATE OF ISSUANCE August 11, 2010 <br /> You are directed to proceed promptly with the following change (s): <br /> Description: Please provide a lump sum cost to add the concrete, reinforcing and anchor <br /> bolts shown in the attached drawing. <br /> Purpose of Work Change Directive: Provide anchorage designed for the submitted <br /> Recovered Water Pump Station metal building. <br /> Attachments: (List documents supporting change): Drawing SK-1. <br /> If a claim is made that the above change(s)have affected Contract Price or Contract Times,any claim <br /> for a Change Order based thereon will involve one or more of the following methods of determining the <br /> effect of the change(s). <br /> Method of determining change Method of determining change <br /> In Contract Price: in Contract Times: <br /> El Unit Prices ❑ Contractor's records <br /> ® Lump Sum ❑ Engineer's records <br /> ❑ Other ❑ Other <br /> Estimated increase(decrease) in Contract Price: Estimated increase(decrease) in Contract Times: <br /> $9,726.11 Substantial Completion 0 days: <br /> If the change involves an increase,the Ready for final payment 0 days: <br /> estimated amount is not to be exceeded if the change involves an increase,the estimated <br /> without further authorization. times are not to be exceeded without further <br /> authorization. <br /> ACCEP D: St A l.` J Corporation AUTHORIZED: City • Everett <br /> f / Date: 1 !r <br /> By: Date:' 'r(�y 1 "{ ��P By: (Authorized Signature) r <br /> (A horized-ignature) <br /> • <br /> 175 <br /> 1 <br />