My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> STELLAR J CORPORATION <br /> City of Everett,Washington <br /> Construction of Lake Chaplain Recovered Water Outfall Improvements <br /> SJC Project No:599 <br /> Change Order Proposal No: 002 <br /> Description: Change Order Request#002-Response to owner work change directive#002-Changes to RWPS Foundation <br /> concrete as detailed in SK-1. <br /> Contract Time Extension Request:None <br /> Date: 8/30/10 <br /> Change Order Proposal Summary: <br /> DESCRIPTION Rates COST <br /> Labor Cost Daily Total: — $5,091.00 <br /> Lump Sum Mark-up: 20% $1,018.20 <br /> S/C Direct Cost Daily Total: — $0.00 <br /> Lump Sum Mark-up: 5% $0.00 <br /> All Other Direct Cost Daily Total: — $2,742.40 <br /> Lump Sum Mark-up: 15% $411.36 <br /> SIT: — $9,262.96 <br /> Insurance, Builder's Risk, Bond and B&O Taxes: 5% $463.15 <br /> TOTAL LUMP SUM PRICE: — $9,726.11 <br /> WSST 8.3%: 8.30% $807.27 <br /> TOTAL LUMP SUM PRICE(Including Tax): — $10,533.38 <br /> S/T Labor Hours: 73.00 <br /> Notes: <br /> 1. This proposal is hased on straight time labor and equipment unless expressly noted. <br /> 2. This proposal is for direct costs only,Contractor reserves the right to claim for impact and consequential costs. <br /> Page 1 <br /> 177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.