My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I6 <br /> EQUIPMENT: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> A CONCRETE ADDITIONS <br /> 1 Concrete Vibrator HRS 6.00 $5.00 $30.00 <br /> 2 Bushhammer HRS 2.00 $5.00 $10.00 <br /> Total Equipment Cost: $40.00 <br /> SUBCONTRACTOR: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> A CONCRETE ADDITIONS $0.00 <br /> 1 Rebar Placement-included in labor hours above $0.00 <br /> 2 Pumptruck: Not required. $0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Total SIC Cost: $0.00 <br /> Health and Safety.,Small Tools,Warranty and As-Built <br /> No. DESCRIPTION TOTAL COST <br /> 1 Health and Safety $277.29 <br /> 2 Small Tools $277.29 <br /> 3 Warranty $207.97 <br /> 4 Asbuilt $138.64 <br /> Total Cost: $901.19 <br /> Page 2 of 2 <br /> 179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.