My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> EQUIPMENT: <br /> NO. DESCRIPTION -. UNIT UNITS UNIT COST TOTAL COST <br /> 1 200 Excavator-8-19-10 HRS 3.00 $111.80 $335.40 <br /> 2 200 Excavator-8-30-10 HRS 6.00 $111.80 $670.80 <br /> 3 Reachfork-8-30-10 HRS 4.00 $73.85 $295.40 <br /> 4 200 Excavator-8-31-10 HRS 1.50 $111.80 $167.70 <br /> 5 Reachfork-8-31-10 HRS 1.50 $73.85 $110.78 <br /> Trench Box-Rental-Total Rent(includes delivery) $125.00 <br /> 6 DAY x 2+$50 Delivery/$50 Pickup+Tax(Rental) LS 1.00 $379.05 $379.05 <br /> Total Equipment Cost: $1,959.13 <br /> SUBCONTRACTOR: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> none $0.00 <br /> $0.00 <br /> $0.00 <br /> Total S/C Cost: $0.00 <br /> Health and Safety,Small Tools,Warranty and As-Built <br /> No. DESCRIPTION TOTAL COST <br /> 1 Health and Safety $265.61 <br /> 2 Small Tools $265.61 <br /> 3 Warranty $199.21 <br /> 4 Asbuilt $132.80 <br /> Total Cost: $863.23 <br /> Page 2 of 2 <br /> 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.