My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> EXHIBIT B <br /> ROTH HILL,LLC City of Everett UP No.3443 Date: 12-Nov.2010 <br /> BUDGET FEE ESTIMATE Water Main Replacement'K' <br /> RH job#0067.00XXX.000 <br /> Tasks Description Labor Reimb. Consultant Total <br /> ENGINEERING SERVICES <br /> A Project Management $ 53,645 $ 2,865 $ - $ 56,510 <br /> B Utility Location/Research $ 2,325 $ 120 $ 10,500 $ 12,945 <br /> C Topographic Survey and Basemap Drawings $ 35,080 $ 3,110 $ - $ 38,190 <br /> D Geotechnical Engineer $ 1,545 $ 50 $ 26,145 $ 27,740 <br /> E Preliminary Design $ 50,360 $ 3,310 $ - $ 53,670 <br /> F 60%Design $ 67,590 $ 4,625 $ - $ 72,215 <br /> G Permitting Assistance $ 5,770 $ 500 $ - $ 6,270 <br /> H 90%Design $ 33,375 $ 2,880 $ - $ 36,255 <br /> I Final Design/Bid Document $ 18,265 $ 2,200 $ - $ 20,465 <br /> J Bidding Assistance $ 5,190 $ 150 $ - $ 5,340 <br /> K Construction Services $ 35,825 $ 1,075 $ - $ 36,900 <br /> L Unanticipated Tasks $ 20,000 $ - $ 20,000 <br /> TOTALS $ 328,970 $ 20,885 $ 36,645 $ 386,500 <br /> 3 9 S:1RHeftitzProjects13443_Lowell_Imprvt_K\ConsultantContractlBudget Exhibit 111210.z1sz <br />
The URL can be used to link to this page
Your browser does not support the video tag.