Laserfiche WebLink
it <br /> '35. Wetland mitigation banking approval as provided by Sections 19.33D.460(C)(10) and <br /> 19.37.120(C)(12); <br /> 36. Clinic-and medical-related activities as provided by Section 19.16.040(C); <br /> 37. All other review processes listed in the zoning code as Review Process II; <br /> 38. All Review Process I and project permit applications that are not categorically exempt <br /> under SEPA; <br /> 39. Alternative best available science decisions as provided by Section 19.37.050(E); <br /> '40. Accessory buildings over two hundred square feet which have metal siding or corrugated <br /> 'roofing as provided by Section 19.07.020(K); <br /> 41. Accessory buildings which exceed one thousand square feet in area as provided by Section <br /> 19.07.020(M); <br /> 42. Accessory buildings which exceed fifteen feet in height as provided by Section 19.7.020(J); <br /> 43. Rockeries and retaining walls retaining soil (fill)four feet or greater in height in required <br /> building setback areas, as provided by Section 19.39.150(C)(5)(d); <br /> `44. Alternative method of design for basic design standards in the B-3 zone, as provided by <br /> Section 19.22.020(D)(1)(d); <br /> 45. Alternative method of design for design standards in the BMU zone, as provided by <br /> Section 19.31A.040. <br /> 46. A Detached accessory dwelling unit as provided by Section 19.07.030(C). <br /> * SEPA threshold determinations frequently include mitigation requirements as provided for in <br /> the SEPA ordinance (Chapter 20.04). Any SEPA condition based on SEPA substantive <br /> authority as provided for in the SEPA ordinance(Chapter 20.04) shall be identified in the land <br /> use permit decision, as provided in this integrated local project review process. <br /> ** An open public hearing may be required under the following circumstances, in which case <br /> the application shall be processed under Review Process III: (i) a public hearing is required by <br /> Title 18; (ii) any affected person files a written request for a hearing with the planning <br /> department within twenty-one days of the notice of application(public comment period); or <br /> (iii) either prior to or within the public comment period, the director or the city engineer and/or <br /> their designees require an open public hearing. <br /> 24 <br /> 84 <br />