Laserfiche WebLink
2 <br /> Exhibit A-1 <br /> Scope of Work <br /> Project No. Broadway Bridge <br /> Attached, please find the detailed scope of work for the Phase Tor the Rrid• . Alternative Study Phase <br /> Tn summary, TranTech's team will he performing the fallowing Tasks. <br /> 1 TranTech Engineering, T.Tf -Bridge Design and Project Manag-ment <br /> Perteet, Inc Cavil/Traffic Design, Surveying, Public Involvement and Environmental Permitting <br /> '3 Murray, Smith and Associates, Inc -TTtility Coordination and Desi in <br /> 4 Makers Inc - Aethetics/TTrhan Design <br /> S William Ott and Assoc - Construction C.nnstnuctability and Estimation <br /> h HWA CTensciences,Inc - Geotechnical Eng'neering <br /> 7 MCR Logistics, T.T.C. -BNSF Coordination <br /> Documents To Be Furnished By The Consultant <br /> DOT Form 140-089 EF Exhibit A-1 <br /> 1 2 <br /> Revised 6/05 <br />