My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Exhibit E-1 <br /> Consultant Fee Determination - Summary Sheet <br /> (Lump Sum, Cost Plus Fixed Fee, Cost Per Unit of Work) <br /> Project: Broadway Bridge Replacement Project <br /> Direct Salary Cost (DSC): <br /> Classification <br /> )elan Hours Rate = = Cyst <br /> Principal-QA/QC 24.0 X 75.00 $ 1,800.00 <br /> Project Manager 438.0 X 59.00 25,842.00 <br /> Principal Engineer 40.0 X 59.00 2,360.00 <br /> Principal Structural 308.0 X 54.50 16,786.00 <br /> Construction PM 40.0 X 48.00 1,920.00 <br /> Principal Engineer 8.0 X 46.50 372.00 <br /> CADD Technician 280.0 X 37.00 10,360.00 <br /> Staff Structural 280.0 X 34.00 9,520.00 <br /> Clerical 60.0 X 18.00 1,080.00 <br /> Total DSC = $ 70,040.00 <br /> Overhead (OH Cost-- including Salary Additives): <br /> OH Rate x DSC of 146.84 % x$ 70,040.00 102,846.74 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30 % x $ 70,040.00 21,012.00 <br /> Reimbursables: <br /> Itemized 2,500.00 <br /> Subconsultant Costs (See Exhibit G): 368,828.26 <br /> Grand Total ] 565,227.00 <br /> Prepared By: 7—",) Date: VOE,/, .e9/0 <br /> DOT Form 140-089 EF Exhibit E-1 <br /> Revised 6/05 3 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.