My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet 2 <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: HWA Geosciences,Inc <br /> Direct Salary Cost (DSC): <br /> Classification NIan Hours ___ Baia -- = Cost <br /> Principal 25.0 X 75.48 $ 1,887.00 <br /> Senior Geotech.Engr. 137.0 X 48.08 6,586.96 <br /> Project Geotech.Engr. 230.0 X 32.69 7,518.70 <br /> Enviro. Geologist 60.0 X 32.69 1,961.40 <br /> Field Geologist 60.0 X 26.92 1,615.20 <br /> Traffic Control Flagger 56.0 X 21.63 1,211.28 <br /> CADD 20.0 X 21.63 432.60 <br /> Admin 16.0 X 20.43 326.88 <br /> X <br /> Total DSC = $ 21,540.02 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of 166.33 % x $ 21,540.02 = 35,827.52 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30 % x $ 21,540.02 = 6,462.01 <br /> Reimbursables: <br /> Itemized = 34,363.00 <br /> SubConsultant Total = <br /> Grand Total = 98,192.54 <br /> Prepared By: HWA Geosciences, Inc. Date: November 19, 2010 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 4 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.