Laserfiche WebLink
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: Makers <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours flak Cost <br /> Partner/PM 60.0 X 150.00 $ 9,000.00 <br /> Urban Designer(SM) 130.0 X 85.00 11,050.00 <br /> Urban Designer 50.0 X 85.00 4,250.00 <br /> X <br /> X <br /> X <br /> X <br /> X <br /> X <br /> Total DSC = $ 24,300.00 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of % x $ 24,300.00 = 0.00 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of % x $ 24,300.00 = 0.00 <br /> Reimbursables: <br /> Itemized = 10,582.00 <br /> SubConsultant Total = <br /> Grand Total = 34,882.00 <br /> Prepared By: Makers Date: November 19, 2010 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 <br /> 51 <br />