My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: Makers <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours flak Cost <br /> Partner/PM 60.0 X 150.00 $ 9,000.00 <br /> Urban Designer(SM) 130.0 X 85.00 11,050.00 <br /> Urban Designer 50.0 X 85.00 4,250.00 <br /> X <br /> X <br /> X <br /> X <br /> X <br /> X <br /> Total DSC = $ 24,300.00 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of % x $ 24,300.00 = 0.00 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of % x $ 24,300.00 = 0.00 <br /> Reimbursables: <br /> Itemized = 10,582.00 <br /> SubConsultant Total = <br /> Grand Total = 34,882.00 <br /> Prepared By: Makers Date: November 19, 2010 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 <br /> 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.