Laserfiche WebLink
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: MCR Logistics,Inc <br /> Direct Salary Cost (DSC): <br /> Classification — Allan Hours $fig _ ___---_.._._Cost <br /> PM 107.0 X 80.00 $ 8,560.00 <br /> X <br /> X <br /> X <br /> X <br /> X <br /> X <br /> X <br /> X <br /> Total DSC = $ 8,560.00 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of % x $ 8,560.00 = 0.00 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of % x $ 8,560.00 = 0.00 <br /> Reimbursables: <br /> Itemized = 500.00 <br /> SubConsultant Total = <br /> Grand Total = 9,060.00 <br /> Prepared By: Date: <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 5 8 <br />