Laserfiche WebLink
PUB�IC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5 Connect side sewer per City Standard #601. <br />�6,)Connect side sewer per Ciry Standard tt's 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainag= system providcd tor this lat\ <br />�9.�Rooftop runoH must be discharged to a roof dow pout infiltr�tion system per City of Everett <br />Storm Manual 3-2.6.2. Width �3 , Depth ��� ; Lenyth � � <br />10. The contract�r must meet with the Public Work Jnspectort isc�potential drainage <br />routing prior to beginning the project. — <br />�1 .� insta;l erosion control measures as determined by the Public Works inspector, ��ch as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />�1�3. Remove erosion controi measures upon completion oi the project prior to final approval oi the <br />l: �permit. <br />�14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting ol material is ailowed on this building lot. <br />15. Femove and replace curb, g�itter and sidewalk as per City ol Everett Standard Plan lPs 305A <br />8 306 on this proposal's irontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concre�e driveway per City of Everett Standard #307. <br />�"'i <br />(17.JPave driveway trom the iront property line out tc the street paving. <br />18. Contact the __ Water District for connecting provisions for this building's <br />water and sewer ser�ices. <br />19. A catch basin as per City Standard Plan #4G2 with a gas trap per Stanclard Plan q410 is <br />required for ihe parking area. <br />20. Ii a sewer pump system is to be instalied, the pressure line must discharge into a private <br />manhole, then gravity ilow across the public right-of-way. <br />27. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />S�andards 13D. <br />