Laserfiche WebLink
• <br /> ,: MSI - COP WORKSHEET / BREAKDOWN <br /> K cfwn aMY Sano ata, <br /> Summary of proposed Change Order costs for work performed exclusively by MSI. <br /> 3146 EVERETT WPCF PHASE B-1IMPROVEMENTS <br /> Description of work: Work shown on Work Change Directive No 001 dated 5/11/10. <br /> Requested by: CO Proposal#: 1 Revised <br /> Work authorized by: WCD I CPR#: 1 <br /> Authorization date: RFI#: o <br /> Proposal Date: June 18,2010 FA#: o <br /> FO#: o <br /> Proposal summary <br /> Costs of delay to contract due to this,change may not be included in this proposal, but will be <br /> DIRECT COST SUMMARY: BASE LABOR RATE <br /> ITEM UNIT LABOR ITEM LABOR LABOR MATERIAL TOTAL <br /> N ITEM DESCRIPTION QTY FACTOR HOURS RATE COST FACTOR MATERIAL EQUIP <br /> `) PHce Preparation and Procurement 2 $75.00 $150.00 <br /> • <br /> • <br /> Operator Trenching,Bedding,Backfill 18 <br /> .._.._.... $56.72 -$1,020.96 • <br /> Laborer Trenching,Bedding,Backfill 18 $46.55 -$837.90 <br /> • <br /> • <br /> Sand 32 24 • $ (768.00) <br /> Crushed Rock 10.5 22 • $ (231.00) <br /> — Excavator • 18 50 $ (900.00) <br /> • <br /> Compactor 8 32 • $ (256.00) <br /> • <br /> -$1,708.86 -999 -1156 <br /> • <br /> • rJ <br /> 9/9/2010 Page 2 of 2 MSI Worksht <br />