My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/29 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 8:48:38 AM
Creation date
4/28/2017 8:47:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?, <br /> • <br /> PROPOSED CHANGE ORDER <br /> CCN# 001 #3 <br /> Cochran Inc Date: 9/2/2010 <br /> 12500 Aurora Ave North Project Name: Everett Waste Wate <br /> Seattle,Washington 98133 Project Number. WO#1JP-2258 <br /> Page Number: 1 <br /> Client Address: <br /> McClure and Sons <br /> - Contact:Ryan Brown <br /> 15714 Country Club Drive <br /> Mill Creek,-Washington 98012 <br /> Work.Desgrietion Phase B-1_WO#UP-358.: __ ��------_-... - - --....._ - _ <br /> .WCD 001 item#3 Deductive Chanoe Re-use conductors between SWBD 1051 and SCC-E_. <br /> inclusions: <br /> *Reuse P-SCC-E conductors between SWBD 1051 and SCC-E <br /> `Ail work during normal business hours <br /> 'Electrical permit&inspection <br /> `One-year warranty on workmanship&Cochran-supplied material <br /> `Overtime&shift work <br /> `Sales tax,if applicable <br /> Clarifications: <br /> 1) Cochran,Inc.shall not be held liable for errors or omissions In designs by others,nor inadequacies of materials and equipment - <br /> specified or supplied by others. <br /> 2) Cochran Inc.shall not incur cost impacts due to delays associated with the plan review process or electrical permit approval. <br /> 3) Hard copies of purchase order or contract with all related contract documents shall be issued to Cochran Inc.prior to mobilization <br /> 4) We reserve the right to negotiate specifics of the Contract. <br /> 5) Anything(verbal of written)expressed or implied elsewhere,which is contrary to these conditions shall be null and void. <br /> 6) Equipment and materials supplied by Cochran,Inc.are warranted only to the extent that the manufacturer warrants the same. <br /> 7) Idle time incurred by Cochran,Inc:s employees due to absence of required escorts,clearances,inability to enter the workspace,or <br /> other factors beyond our control will be considered a change to the Contract. <br /> 8) The proposal Is good for 30 days from the date of the proposal. <br /> Itemized Breakdown <br /> be.5eription Qty: Net•Pi'lcej1) Total Mat Lab*U a Tota' <br /> 4" STL GRD BUSHING 1 2,487:80 C -24,88 2383 O t -0.24 <br /> 4" GRC CUT&THREAD 1 0.00 C -0.00 61.88 a z -0.62 <br /> 1 = <br /> 4" PVC CTD GRC -45; 3,954.17.C -197.71 15.81 C 0 75 <br /> 4" PVC CTD GRC CPLG -2 6,256.80 C -125.14: 32:40 C -0.6 <br /> 4" PVC CTD 90 DEG ELBOW :-1 19,004.48 C; t -190.04 168.75 C° _ 1,69 <br /> 4" PVC SCH-80 -1:0 175.90 17.51 10.13 C` -1.01 <br /> 4" PVC TERM ADAPTER :-1 527,24 G_: -5.21 22.50 C -123 <br /> 4" PVC END BELL 4 786.10 C. -7,88 5.63 0, O.QG <br /> 622 1 5/8"DEEP 10"SS 599;09 0 23,96 9.38 C. _ -0.34 <br /> 3/8=16 SS HEX NUT(PLATED) -10: 85.63 0 -8,56 1.88 e :- -0.19 <br /> 318" SS LOCK WASHER(PLT) =10 - 10.37 10.37 C -1.104 0.94 G: -0.09 <br /> 1t3 THHN -860_ 619.00 N -222.84 11.14 M -4.01 <br /> ORIGINAL <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.