Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/21/2016 7:26 <br /> Issued By CSG CAVANAH,SHANE G. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 9/21/2016 <br /> Fund 401 Accounts Program 710 Function 119 Activity 675 <br /> Program <br /> Title RENEW.75 INCH 4959 ELM ST 710119675 <br /> Work Order No 20162228 Project Activity Type CORRECTIVE MAINTENANCE Status PR <br /> Status 9/21/2016 Time 07:21 Original WO 20161928 Billing <br /> Recommended Action <br /> Approved By Job Cost Information(Y/N) <br /> Start Date / / Time Date Completed 9 / i5 / I(. Permit No <br /> Completed Byl_ _ Time Follow Up? <br /> Problem Details <br /> TRANSFER SERVICE TO NEW 8 INCH DI MAIN <br /> Structure ID StrTVp Activity Compl Date Comments <br /> WML3694T06 WAMAI N <br /> Address 4944 ELM ST <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 4922 ELM ST-TO INT. 50th ST <br /> Location <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3694SO09 WASRVC <br /> Address 4959 ELM ST <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 4959 ELM ST <br /> Location <br />