Laserfiche WebLink
Run Date: 12/21/2010 City of Everett-Public Works Department Cutoff Date: 12/24/2010 <br /> Time:• 9:54 AM Contract Estimate Voucher <br /> Project: 257 For Work Order#3400 Contractor: Granite Construction <br /> ARRA HOT MIX ASPHALT OVERLAY Estimate#5 PO Box 60000 <br /> 2010 <br /> WO 3400 BID:$676,300.80 San Fransisco,CA 94160 <br /> TOTAL BID:$676,300.80 <br /> Unit Plan Total Previous Present Total •Previous Present <br /> Item# Description Units Price Quantity Quantify Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 67,000.00 1.00 1.0000 1.0000 0.0000 67,000.00 67,000.00 0.00 <br /> 0002 Flaggers and Spotters HR 0.01 1,900.00 923.0000 923.0000 0.0000 9.23 9.23 0.00 <br /> J003 Traffic Control Supervisor HR 65.00 400.00 390.0000 390.0000 0.0000 25,350.00 25,350.00 <br /> 0.00 <br /> 10504 Other Traffic Control\Labor HR 0.01 780.00 8.0000 8.0000 0.0000 0.08 0.08 0.00 <br /> 011105 HMA Class 1/2",PG 64-22 TN 75.00 2,720.00 2,294.3600 2,294.3600 0.0000 172,077.00 172,077.00 0.00 <br /> 0006 HMA Class 1/2",PG 64-22 for Pre-leveling TN 63.00 370.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0007 Adjust Manhole to Grade EA 750.00 16.00 •5.0000 5.0000 0.0000 3,750.00 3,750.00 0.00 <br /> 0008 Adjust CB/Inlet to Grade EA 400.00 21.00 2.0000 2.0000 0.0000 800.00 800.00 0.00 <br /> 0009 Adjust Valve Box to Grade EA 39.00 13.00 0.0000 0.0000 _ 0.0000 0.00 0.00 0.00 <br /> 0010 Adjust Existing Monument Casting to Grade EA 56.00 9.00 6.0000 6.0000 0.0000 336.00 336.00 0.00 <br /> 0011 Remove&Reset Survey Control Monument EA 1,000.00 2.00 2.0000 2.0000 0.0000 2,000.00 2,000.00 0.00 <br /> 0012 Planing Bituminous Pavement(0-6"Deep) SY 2.00 21,028.00 22,429.1800 22,429.1800 0.0000 44,858.36 44,858.36 0.00 <br /> 0013 Vehicle Loop Detectors LF 11.00 2,475.00 1,362.0000 1,362.0000 0.0000 14,982.00 14,982.00 0.00 <br /> 0014 Temporary Pavement Markings LF 0.05 11,400.00 22,344.0000 22,344.0000 0.0000 1,117.20 1,117.20 0.00 <br /> 0015 Plastic Wide Line LF 1.00 1,140.00 904.0000 904.0000 0.0000 904.00 904.00 .0.00 <br /> I )016 Plastic Traffic Arrow EA 67.00 23.00 26.0000 26.0000 0.0000 1,742.00 1,742.00 0.00 <br /> 0017 24"Plastic Crosswalk Line LF 4.00 1,040.00 854.0000 854.0000 0.0000 3,416.00 3,416.00 0.00 <br /> 0018 24"Plastic Stop Line LF 4.00 285.00 219.0000 219.0000 0.0000 876.00 876.00 0.00 <br /> 0019 Raised Pavement Markers,Type 1 HUND 230.00 4.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0020 Raised Pavement Marker,Type 2 HUND 490.00 1.00 0.0000 • 0.0000 0.0000 0.00 0.00 0.00 <br /> 0021 Paint Line LF 0.57 2,000.00 2,244.0000 2,244.0000 0.0000 1,279.08 1,279.08 0.00 <br /> 0022 Plastic Line LF 0.93 6,200.00 11,074.0000 11,074.0000 0.0000 10,298.82 10,298.82 0.00 <br /> 0023 Spill Prevention Control Plan(SPCP) LS 5,000.00 1.00 1.0000 1.0000 0.0000 5,000.00 5,000.00 0.00 <br /> 0024 Above Ground Conflicts FA 1.00 28,000.00 7,620.8800 6,222.9700 1,397.9100 7,620.88 6,222.97. 1,397.91 <br /> 0025 Existing Private Improvement Restoration FA 1.00 7,000.00 1,260.6800 1,260.6800 0.0000 1,260.68 1,260.68 0.00 <br /> 0026 Remove&Replace Driveway&Road Materials SY 110.00 240.00 407.4600 407.4600 0.0000 44,820.60 44,820.60 0.00 <br /> 0027 Remove&Replace Curb Ramp Materials incl. EA 2,200.00 41.00 42.0000 42.0000 0.0000 92,400.00 92,400.00 0.00 <br />