Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> : <br /> PROJECT TITLE: <br /> 2011 Drinking Water State Briefing COUNCIL BILL# <br /> Revolving Fund Loan Proposed Action . Originating Department Public Works <br /> Application for the Portal#3 Consent Contact Person Dave Davis <br /> Modifications at the Everett Action Phone Number 425-257-8813 <br /> Water Filtration Plant .First Reading FOR AGENDA OF Feb 9, 2011 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President Jolla <br /> Location Preceding Action Attachments Department(s)Approval <br /> Everett Water Filtration Loan Application Admin,Legal, Public <br /> Plant Works <br /> Amount Budgeted $1.06 Million <br /> Expenditure Required $1.06 Million Account Number(s): UP 3192 Portal#3 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Public Works Department is submitting an application to the Washington State Department of Health for <br /> a Drinking Water State Revolving Fund(DWSRF) Loan. This application is for the funding of modifications <br /> at Portal#3 in the Lake Chaplain Reservoir. The project will involve the construction of a stainless steel pipe <br /> which will connect a 54-inch concrete pipe to the tunnels that lead to the transmission lines. This pipe will <br /> then be encased in concrete to provide a positive barrier between the potable water inside Portal #3 and <br /> untreated lake water. The total project cost is estimated to be $1.06 million which is within the funding range <br /> of the DWSRF program guidelines. The terms of this low-interest loan are a 1.5% interest rate with a 20-year <br /> term. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the 2011 Drinking Water State Revolving Fund Loan Application for the Portal <br /> #3 Modifications at the Everett Water Filtration Plant. <br /> 3 <br />