My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/02/23 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/02/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:09:05 AM
Creation date
4/28/2017 11:08:14 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL,.AGENDAITEM COVER SHEET <br /> 1 <br /> PROJECT TITLE: �� <br /> An Ordinance creating a Briefing COUNCIL BILL# ( I OdaD)-01--k <br /> special construction fund Proposed Action Originating Department Public Works <br /> entitled"Water and Sewer Consent Contact Person Dave Davis <br /> System Improvements Fund", Action Phone Number 425-257-8913 <br /> Fund 336 to accumulate all First Reading FOR AGENDA OF Feb 23, 2011 <br /> design and construction costs Second Reading <br /> for critical water and sewer Third Reading <br /> system improvements Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Everett Water System Ordinance 3156-09 Proposed Ordinance Admin, Legal <br /> Everett Sewer System Pending Bond Issue Public Works <br /> Ordinance <br /> Amount Budgeted $ 199,290,000 <br /> Expenditure Required $ 199,290,000 Account Number(s): Fund 336 <br /> Budget Remaining $-0- <br /> Additional Required $-0- <br /> DETAILED SUMMARY STATEMENT: <br /> On November 25, 2009, Council adopted Ordinance 3156-09 increasing water and sewer rates to, in part, <br /> pay for the cost of debt financing construction projects. Additionally,there is a concurrent ordinance before <br /> Council to authorize the issuance of$51 million in water and sewer revenue bonds to complete the <br /> Transmission Line No. 2 and 3 Replacement Project and other water and sewer system improvements. <br /> "Water and Sewer System Improvements Fund", Fund 336 will provide funding from 2011-2014 for capital <br /> construction projects estimated to be $199,290,000.Major water projects to be funded include Transmission <br /> Line No. 2 and 3 Replacement Phases 7, 9, and 10 estimated to be $23.49 million. Major sewer projects to be <br /> funded include the Water Pollution Control Facility Phase B and C estimated to be $53.13 million. Sources <br /> of funding that will finance these projects are revenue bonds, Water and Sewer District Direct Contributions <br /> and City of Everett Utility Department charges for services. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Adopt an Ordinance creating a special construction fund entitled"Water and Sewer System Improvements <br /> Fund", Fund 336 with an initial appropriation of$199,290,000 to accumulate all design and construction <br /> costs for critical water and sewer system improvements. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.