My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/03/02 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/03/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:34:41 AM
Creation date
4/28/2017 11:33:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(7) Authorize the Mayor to sign Amendment No. 1 to the Professional Services <br /> Agreement with Landau Associates extending the Agreement Completion date to <br /> December 31, 2011. <br /> (8) Accept the Carl Gipson Senior Center — Additions with Corstone Contractors, LLC. as <br /> complete and Authorize the Mayor to sign the final contract voucher and certificate <br /> of completion in the amount of $1,103,494.27 including Washington State sales tax <br /> ACTION ITEMS: <br /> (9) Authorize the Mayor to sign the contract with Retail Lockbox, Inc. for lock box <br /> processing services <br /> (10) CB 1102-03 — 3rd and final Reading — Adopt the Proposed Ordinance authorizing the <br /> issuance of Water and Sewer Revenue and Refunding Bonds in the principal <br /> amount not to exceed $51,000,000 for the purpose of acquiring, constructing and <br /> installing certain additions and betterments to and extension of the City's water and <br /> sewer system <br /> (11) CB 1102-02 — 3rd and final Reading - Adopt Proposed Ordinance assuming <br /> jurisdiction over a portion of the Mukilteo Water and Wastewater District's <br /> responsibilities, property, facilities and equipment in areas previously annexed to <br /> the city under ordinance 2422-99 and ordinance 2375-99 <br /> (12) Award contract and Authorize Mayor to sign contract to the lowest responsive <br /> bidder, Stellar 3 Corporation, for the construction of the Water Pollution Control <br /> Facility Phase B-2 Improvements in the amount of $2,519,729.04 including <br /> Washington State Sales Tax <br /> (13) Authorize the Mayor to sign Amendment No. 1 to the Washington State Revolving <br /> Fund Loan with Washington State Department of Ecology for the Bond Street <br /> Combined Sewer Overflow Control Facilities to reduce the loan amount from <br /> $6,249,652.00 to $2,403,145.00 <br /> (14) Authorize the Mayor to sign the Burlington Northern Santa Fe Pipeline License for <br /> the Bond Street Water Main crossing including payment of the $3,500.00 fee <br /> (15) Authorize the Mayor to sign a Professional Services Agreement with AMEC Earth <br /> and Environmental, Inc. for restoration evaluations within the former Drainage <br /> District No. 6 in the amount of $100,000 <br /> (16) Authorize the Mayor to sign E10-249 Contract"Amendment B" with the Washington <br /> State Military Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.