Laserfiche WebLink
3 <br /> TEMPORARY <br /> RIGHT-OF-ENTRY AGREEMENT <br /> Tulalip-Everett Water Main Project <br /> REAL ESTATE MANAGER PROJECT: Proposed Tulalip-Everett Water Main <br /> 3200 CEDAR STREET PARCEL ADDRESS: None <br /> EVERETT, WA 98201 TAX ACCT. #'s: 29050800402000 <br /> OWNER: The Port of Everett <br /> This Temporary Right-of Entry Agreement (this "Agreement") made this day of <br /> , 20 (the "Commencement Date"), by and between the grantor, the <br /> Port of Everett, a port district organized under the laws of the State of Washington, (hereinafter <br /> referred to as "Grantor") for due diligence, hereby grants permission to the City of Everett, a <br /> first class charter city under the laws of the State of Washington (hereinafter referred to as <br /> "City") its authorized agents, assigns, or subcontractors, to enter upon certain lands for the <br /> purposes of planning, surveying, engineering, construction, soil testing, etc. in connection with <br /> the Tulalip-Everett Water Main Project Segment 3 W.O. #3414 (the•"Project"). The land to <br /> which this Agreement applies is set forth in Exhibits "D" and "E", attached hereto and <br /> incorporated herein by reference (the"Property"). <br /> The Grantor and the City, by granting and accepting this Agreement respectively, mutually <br /> covenant and agree as follows: <br /> 1. The City will make reasonable efforts to minimize disruption and inconvenience to the <br /> Property and uses made thereon. The City shall restore the Property to its condition prior <br /> the City's activities hereunder as soon as it has completed the activities causing disruption or <br /> damage to the Property. <br /> 2. This Agreement will terminate at the earlier of such time as the City has completed the <br /> Project on the Property or two (2) years from the Commencement Date; provided, however, <br /> the parties may mutually agree to extend the duration of the Agreement by written addendunx <br /> hereto. <br /> I 4.4 <br />