Laserfiche WebLink
INSPECTION REPORT <br /> @4e7T Date: 1 �j( Permit: lb\ �a 6c� <br /> Contractor: VJQS'ktC r CbfS,�r <br /> Owner: Dfti , - - - -- <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In sLl <br /> Slab El to insulate El OK to insulate <br /> F1 Service raming ❑ Rooftop Units Water Service <br /> E]Grounding ❑I sulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing [71 Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑l Gas Pipe Fingal /❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL El PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F-1OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: J <br /> EIR(4/09) X-�FORMS A PROMOI IONS•425/488-8900 <br />