My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
332 SW EVERETT MALL WAY 2017-05-03
>
Address Records
>
SW EVERETT MALL WAY
>
332
>
332 SW EVERETT MALL WAY 2017-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 3:39:29 PM
Creation date
4/28/2017 2:30:34 PM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
332
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^R4Y ENGINEERING / PUBLIC SERVICES DEPARTMENT <br /> ADMINISTRATIVE ACTION <br /> DATE: March 27, 2007 <br /> LOCATION: New 4-story office building for Frontier Bank, south of the existing 3- <br /> story office building located at 332 Southwest Everett Mall Way. <br /> SUBJECT: Alternative method to meet the requirements for `Pedestrian Walkway' <br /> ACTION: Eliminate the ten foot extension of rated exterior walls at the existing <br /> building intersection with the pedestrian walkway by the following <br /> alternative method: construct the new pedestrian walkway enclosure as a <br /> two-hour fire-resistive structure. Provide 90 minute fire-resistive <br /> doors on hold-opens within the pedestrian walkway to separate the two <br /> buildings. Both buildings and the pedestrian walkway are to be <br /> sprinklered and have fire detection systems per the 2003 IBC. <br /> FINDINGS: <br /> • Separate buildings with an assumed property line indicated halfway <br /> between the two structures, per 2003 IBC Section 704.3. <br /> ■ Distance separating the buildings is more than 10 feet and the <br /> pedestrian walkway is protected by an automatic sprinkler system in <br /> accordance with NFPA 13, per 2003 IBC Section 3104.5, exception <br /> one, without glazing. <br /> • All three levels of the pedestrian walkway built of two-hour fire <br /> resistive construction, similar to a tunneled walkway, per IBC <br /> 3104.10, with no exterior openings. <br /> . Buildin official <br /> REFERENCE: The intent of separating the pedestrian walkway from the existing <br /> building is achieved by rating the pedestrian walkway and eliminating the requirement for <br /> opening protectives in the immediate 10 foot vicinity of the pedestrian walkway on the <br /> new and existing structures. <br /> CITY OF EVERETT a 3200 Cedar Street o Everett, WA 98201 * (425) 257-8800 ® Fax(425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.