My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BASE FILE 2018-09-20
>
Address Records
>
W CASINO RD
>
3003
>
BASE FILE
>
3003 W CASINO RD BASE FILE 2018-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 8:30:56 AM
Creation date
5/1/2017 8:15:28 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATIVE ACTION <br /> RE: Uniform Plumbing Code Rain Leader Material <br /> ACTION: Schedule 10 Galvanized Steel Pipe will be accepted as rain <br /> leader in the Hi-Bay Buildings at the Boeing Aircraft <br /> Company, Everett Plant. <br /> FINDINGS: <br /> * The strength of the steel pipe is adequate to support the <br /> pipe horizontally with less deflection than standard schedule <br /> pipe per recommended support spacing; <br /> * Schedule 10 steel piping is approved by NFPA for fire <br /> sprinkler systems with pressure up to 300 psi; <br /> * The grooves for the Victaulic couplings will be pressed into <br /> the pipe rather than cut, to prevent the wall thickness at <br /> that point in becoming too thin. <br /> * Schedule 10 is resistant to direct impact. <br /> ic.Cz- <br /> Building Official <br /> b1d98.71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.