My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/03/23 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/03/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 8:34:23 AM
Creation date
5/1/2017 8:33:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT°CITY CO JNCLL AGENDA ITEM COVER SHEET <br /> 4 <br /> PROJECT TITLE: <br /> Call for Bids for Portal#3 Briefing COUNCIL BILL# <br /> Modifications Proposed Action Originating Department Public Works <br /> Consent Contact Person Tim Marks <br /> Action Phone Number 425-257-8872 <br /> First Reading FOR AGENDA OF 3-23-2011 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA .L <br /> Council.President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Portal#3 on the Westside PSA with URS Utilities <br /> of Chaplain Reservoir Corporation 2-1-2011 <br /> Amount Budgeted 1,400,000 <br /> Expenditure Required $1,000 Account Number(s): UP 3192 <br /> Budget Remaining 1,399,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Portal#3 is located on the Chaplain Reservoir. Filtered water pumped to Portal#3 flows through a pipe, free <br /> falls 30 vertical feet,then flows into Tunnel#2. Minor leakage of untreated water from Tunnel#2 enters <br /> Portal#3 and mixes with the filtered water that is delivered from the Water Filter Plant. Any leakage of <br /> untreated water with the filtered water would constitute a possible cross connection. A plan to hard pipe the <br /> filtered water through Portal#3 and inject grout into Tunnel#2 to prevent leakage has been prepared by URS <br /> corporation. The project is ready to bid at this time and the engineers estimate to complete this work is <br /> $1,200,000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Call for Bids for Portal#3 Modifications. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.