My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/03/30 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/03/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 8:41:01 AM
Creation date
5/1/2017 8:40:47 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/30/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 4 <br /> Call for Construction Bids Briefing COUNCIL BILL # <br /> for the Water Transmission Proposed Action Originating Department Public Works <br /> Line 3 —Phase 7 3/30/2011 Consent Contact Person Souheil Nasr <br /> Replacement project Action Phone Number (425)257-7210 <br /> First Reading FOR AGENDA OF 3/30/2011 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA • - <br /> Council President al <br /> Location Preceding Action Attachments Department(s) Approval <br /> South side of US-2 Authorization to Sign Public Works <br /> between Home Acres Rd Professional Services <br /> and Ebey Slough east of Agreement with MWH, <br /> the City. Americas to Prepare <br /> Engineering Design and <br /> Permitting Services for <br /> Replacement of Water <br /> Transmission Line 3— <br /> Phase 7. <br /> Amount Budgeted $7,685,798 <br /> Expenditure Required $2,000 Account Number(s): UP-3437 <br /> Budget Remaining $7,683,798 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Replacement for Water Transmission Line# 3 —Phase 7 project is ready to advertise for construction <br /> bids. This project will replace approximately 4,200 feet of the existing elevated 48-inch diameter Water <br /> Transmission Line 3 between Home Acres Road and Ebey Slough immediately south of US-2 and east of the <br /> City. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Call for Construction Bids for the Replacement of Water Transmission Line 3—Phase 7 Replacement project. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.