My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/13 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/04/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 9:08:02 AM
Creation date
5/1/2017 9:07:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Ordinance granting Providence Briefing COUNCIL BILL# edg/J4"— <br /> Health & Services Washington, Proposed Action Originating Department Real Property <br /> permission to operate an enclosed Consent Contact Person Mike Palacios <br /> pedestrian skybridge and utility Action Phone Number 425-257-8938 <br /> corridor within the 13th Street 4/13/11 First Reading FOR AGENDA OF 4/13/11 <br /> right of way. <br /> 4/20/11 Second Reading <br /> 4/27/11 Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA 1� <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> 13"� Street east of 7/20/05 City Council Ordinance All <br /> Wetmore Ave Ord.2850-05 adopting Map <br /> Comp Plan, Rezone and <br /> Master Plan for PEMC <br /> 8/20/08 City Council <br /> Ord.3090-08 adopting <br /> Comp Plan, Rezone and <br /> Master Plan for PEMC and <br /> ECC Property <br /> Amount Budgeted -0- <br /> Expenditure Required -0- Account Number(s): <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> In July 2005, City Council approved an amendment to the Comprehensive Plan, a Rezone and a Master Plan for the <br /> Providence Everett Medical Center Expansion. In August 2008, City Council further amended the Comprehensive <br /> Plan, Rezone and Master Plan for the Providence Everett Medical Center Expansion on the Everett Community <br /> College Property. <br /> The 2008 master plan provided for the construction of a pedestrian bridge over 13th Street and a utility corridor under <br /> l3"' Street. <br /> The pedestrian skybridge will connect the Medical Tower which is located on the south side of 13t1 Street to the <br /> Cancer Center building located on the north side of 13`h Street. The skybridge will be 203 feet long,be approximately <br /> 12 feet wide by 12 1/2 feet tall and provide a minimum clearance of 22 feet above 13th Street. The utility corridor <br /> provides for utility services between the Utility building located on the north side of 13th Street with the hospital and <br /> other facilities located north and south of 13`h Street. <br /> The attached Ordinance providing for the pedestrian skybridge and utility corridor within 13th Street provides: 1) <br /> preservation of the City's rights to use 13th Street right of way for public travel, utilities, and other public purposes; 2) <br /> a term of 50 years with a renewal term for an additional 25 years; and 3) a one-time fee of$30,720 to the City for use <br /> of the 13`h Street right of way. <br /> RECOMMENDATION (Exact action requested of Council): Adopt Ordinance granting Providence Health & <br /> Services Washington, permission to operate an enclosed pedestrian skybridge and utility corridor within the 13th Street <br /> right of way. 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.