Laserfiche WebLink
➢ ����In <br /> 5' <br /> Submittal Data <br /> Boeing Medical Trailers Updated <br /> Purchaser: Holaday-Parks, Inc. <br /> Date: August 24, 2016 <br /> Prepared By: Geary Pacific Supply <br /> Ryan Macauley NO EXCEPTIONS NOTED <br /> m: 971 .300.8810 EXCEPTIONS NOTED: <br /> NO RESUBMISSION REQUIRED X <br /> EXCEPTIONS NOTED: <br /> RESUBMIT FOR RECORD <br /> REVISE AND RESUBMIT <br /> Correction or comments made on the shop drawings during this review do not relieve the <br /> contractor from compliance with requirements of the drawings and specifications.This <br /> check is only for review of general compliance with the design concept of this part of the <br /> project and general compliance with the information given in the contract documents. <br /> The contractor is responsible for providing all information necessary for this review: <br /> confirming and correlating all quantities and dimensions.selecting fabrication <br /> processes,techniques and sequences of construction:coordinating work with that of <br /> other trades and performing work in safe and satisfactory manner.Notations on this <br /> drawing do not authorize changes to the contract documents without v itten <br /> authorization from the owner's representatives. <br /> 6 SBR <br /> date: 11/03/2016 by: Matthew Longsine <br /> WSP Comments: <br /> 1) Provide the 2.5 Ton options as schedule. <br /> 2) Model number specified indicates a Bard T30S which indicated stepped control. The model <br /> number submitted indicated a Bard T30H, which does not have stepped control. Provide the 'S' <br /> model for stepped control. <br /> 1/v <br />