7 <br /> Construction Documents Phase <br /> Prepare all construction plans,bidding documents and details for plaza project including but not <br /> limited to the following: <br /> - Demolition plan <br /> - Paving plans <br /> - Utilities plan <br /> - Lighting plan <br /> - Integrated plaza design elements and estimate <br /> - Former Key Bank—connection of roof drains to site drainage system plan <br /> - Plaza sound system power and conduit plan <br /> Bidding Phase <br /> Attend pre-bid conference;answer contractors' questions,prepare bid addenda,and review bids. <br /> Construction Administration Phase <br /> Administer and oversee coordination of construction contract activities for plaza project including <br /> but not limited to the following: <br /> - Attend pre-construction conference <br /> - Consultant team to perform site observation visits/meetings(up to six for Nakano <br /> Associates;up to three per subconsultant firm)to observe the progress and quality of <br /> work <br /> - Document all construction progress with reports as appropriate <br /> - Respond to requests for information(RFI's)and contractor questions <br /> 100 <br />