Laserfiche WebLink
SECTION 1. A special project fund is hereby established as Fund No. 386, <br /> entitled "Paine Field Boulevard Corridor Analysis Extension Study, and <br /> Preliminary Design Study" , to accomplish the actions authorized in Section 3 <br /> of this Ordinance. <br /> SECTION 2. Authorization is hereby granted for the "Public Works Department" <br /> to assume full and complete responsibility for conductiong all tasks to <br /> accomplish the actions authorized in Section 3 of this Ordinance. <br /> SECTION 3. The tasks or actions to be performed under this Ordinance are: <br /> a. Phase I: <br /> Conduct a "Transportation System Planning Analysis" to provide <br /> travel demand forecasts and existing demand analysis for the SR <br /> 525/Paine Field Boulevard Traffic Corridor, which will be used to <br /> support subsequent, project-specific EISs created for various <br /> improvement projects. <br /> b. Phase II: <br /> Conduct a "Paine Field Boulevard Exension Study" that determines <br /> the technical and economic feasibility of a future northern <br /> extension of roadway between SR 526 and the Mukilteo waterfront, <br /> along Japanese Gulch. <br /> c. Phase III: <br /> Conduct a "Preliminary Engineering Design Alignment, and Cost <br /> Study" of the new roadway between SR 526 and SR 525, along the <br /> west side of Paine Field. The Study should include, at a minimum <br /> the following: traffic, environmental, right-of-way, structural, <br /> geotechnical, drainage, utility, soils, geometric design, traffic <br /> control, signalization, intersection design, illumination, <br /> maintenance, and cost considerations. <br /> SECTION 4. The maximum estimated cost of this project is $528,000 which <br /> includes all costs related for Phase I, II, III, as outlined in Section 3. <br /> SECTION 5. The City shall receive into this fund certain funds from the City <br /> of Mukilteo, Snohomish County, Boeing, TIA, and other "Participants" in the <br /> Study and shall utilize these funds only for those purposes identified in <br /> Section 3 of this Ordinance. <br /> SECTION 6. The sum of $528,000 is hereby appropriated to Fund No. 386. <br /> a. Appropriation: <br /> Phase I, Phase II, and Phase III - $528,000. <br /> 2 <br />