My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/06/01 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/06/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 9:02:20 AM
Creation date
5/3/2017 9:00:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. .. � .. 4s. -:d#j {���, .t' <br /> w �.v'vE+ ? ,� fir <br /> �° � Mc �a �t ,+>�r F� '+,F � � � ���"x 3 <br /> PROJECT TITLE: 1 <br /> An Ordinance creating a special Consent COUNCIL BILL# ((ti-4(c, <br /> Originating Department F�arks <br /> improvement project entitled Action g g p <br /> "Bayside Park Phase 2 5/18 First Reading Contact Person Paul Kaftanski <br /> Improvements Project," Fund 5/25 Second Reading Phone Number 425-257-8335 <br /> 354,Program 031,to accumulate 6/01 Third Reading FOR AGENDA OF May 18, 2011 <br /> all costs for the improvement Public Hearing <br /> project and repealing Ordinance Proposed Action Initialed by: <br /> No. 2905-06 Department Head <br /> CAA �- <br /> Council President lei! <br /> Location Preceding Action Attachments Department(s) Approval <br /> Bayside Park Call f6r bids, 7/7/10 Proposed Ordinance Admin,Parks <br /> 1201 231-d Street <br /> Amount Budgeted $200,000 Account Number: Fund 354,Program 031 <br /> Expenditure Required $315,000 Fund 354, Program 031 <br /> Budget Remaining 0 <br /> Additional Required $115,000 Fund 354, Program 031 <br /> DETAILED SUMMARY STATEMENT: <br /> The Bayside Park Phase 2 Improvements Project consists of a new pathway system, improved accessibility, <br /> an irrigation system, lighting, and amenities. The original authorized$200,000 in Ordinance No. 2905-06 <br /> has been fully expended on site development,the initial pathway system including grading and curbing,the <br /> irrigation system, and site landscaping. This proposed ordinance completes the renovation of Bayside park <br /> including an accessible concrete sidewalk, galvanized steel railings, cobblestone gutters, concrete stairs, <br /> gravel paths, a picnic table,pedestrian path lighting, and the reconfiguration of a twenty foot section of the <br /> existing rockery wall. These improvements will fulfill the Bayside Park Master Plan objectives to provide an <br /> accessible walking trail and places to recreate. The proposed additional funding amount of$115,000 <br /> reflects the lowest responsive, responsible bid for this project, including a 13% construction contingency and <br /> sales tax. The request to award a construction contract will be brought forward for council authorization on <br /> May 25 with final action scheduled on June 1 in coordination with the second and third readings of the <br /> proposed funding ordinance. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Adopt an Ordinance creating a special improvement project entitled"Bayside Park Phase 2 Improvements <br /> Project," Fund 354, Program 031,to accumulate all costs for the improvement project and repealing <br /> Ordinance No. 2905-06. <br /> 151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.