Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER MEET <br /> PROJECT TITLE: 2 1 <br /> • Award of construction contract r Consent COUNCIL BILL# <br /> to IMCO General Action Originating Department Public Works _ <br /> Construction, Inc. for the First Reading Contact Person Souheil Nasr <br /> "Replacement of Water Second Reading Phone Number (425) 257-7210 <br /> Transmission Line No. 3 — Third Reading FOR AGENDA OF May 25, 2011 <br /> Phase 7"project Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President AMA <br /> Location Preceding Action Attachments Department(s) <br /> Approval <br /> South of US-2 between 51st Summary of bid PW <br /> Ave SE and Ebey Slough tabulations. <br /> East of Everett. <br /> Amount Budgeted $8,000,000 <br /> Expenditure Required $6,174,996.00 Account Number(s): UP 3437 <br /> Budget Remaining $1,508,802.00 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> On May 10, 2011, 9 project bid proposals were received for construction of the Replacement of Water <br /> Transmission Line No. 3 —Phase 7 project. The bids, which include sales tax, range from a low bid of <br /> $6,174,996.00 to a high bid of$6,944,833.16. The Engineer's estimate, including sales tax, was <br /> $8,496,495.85. An evaluation of the low bid proposal from IMCO General Construction, Inc. was found to <br /> meet all contract bidding requirements; therefore the City recommends that IMCO be awarded the <br /> construction contract for the Replacement of Water Transmission Line No. 3 —Phase 7 project for the <br /> amount of$6,174,996.00. <br /> Previously authorized expenditures for the project include $314,202.00 for design services through award of <br /> contract and $2,000 for advertising the call for construction bids. Total expenditures requested to date, <br /> including this request for construction award, are $6,491,198.00. The budget remaining is $1,508,802.00. <br /> RECOMMENDATION: <br /> Award construction contract and authorize the Mayor to sign the contract with IMCO General Construction, <br /> Inc. for the Replacement of Water Transmission Line No. 3 —Phase 7 project in the amount of <br /> $6,174,996.00, including Washington State sales tax. <br /> 167 <br />