ti <br /> BID TABULATION <br /> Replacement of Water Transmission Line No.3,Phase 7 - <br /> W.O.#UP 3437-4 <br /> Date 5/10/2011 <br /> Prepared By:William Barrett <br /> For:Souhell Nasr,Project Engineer ENGINEER'S ESTIMATE Bergerson Construction Bidder#10 BIdder#11 Bidder#12 <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> II ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE V AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 19 Remove&Dispose/Salvage IS 1 $122,696.00 $122,696.00 $174,816.00 3174,816.00 $0.00 $0.00 $0.00 <br /> Existing Pipeline No.3 <br /> 20 Remove&Dispose/Salvage LS 1 $163,672.00 $163,672.00 $400,479.00 $400,479.00 $0.00 $0.00 $0.00 <br /> Existing Creosote Pile Support <br /> 21 Hydroseed-Seed Mix 1 Acre 1 $2,344.00 $2,344.00 $1,975.00 $1,975.00 $0.00 $0.00 $0.00 <br /> 1 <br /> 22 Hydroseed-Seed Mix 2 Acre 5 $2,344.00 $11,720.00 $900.00 $4,500.00 $0.00 $0.00 $0.00 <br /> 23 Traffic Control Plan& LS 1 $44,362.00 $44,362.00 $138,925.00 $138,925.00 $0.00 $0.00 $0.00 <br /> Maintenance <br /> 24 Traffic Control Labor Hour 800 $55.00 $44,000.00 $58.00 $46,400.00 $0.00 $0.00 $0.00 <br /> 25 Record Drawings LS 1 $5,520.00 $5,520.00 51,500.00 $1,500.00 $0.00 $0.00 $0.00 <br /> 26 Vibration&Settlement Monitoring LS 1 $136,581.00 $136,581.00 $79,300.00 $79,300.00 $0.00 $0.00 $0.00 <br /> 27 Additional Steel Pipe Pile Splice EA 85 5555.00 $47,175.00 $1,161.00 $98,685.00 $0.00 $0.00 $0.00 <br /> 2.Fumish Additional Steel Pipe Pile LF 1550 576.00 $117,800.00 $104.00 $161,200.00 $0.00 $0.00 $0.00 <br /> J Length <br /> In _ <br /> Base Bid $7,823,661.00 $6,394,874.00 S0.00 $0.00 50.00 <br /> Sales Tax 8.6% $672,834.85 $549,959.16 $0.00 $0.00 $0.00 <br /> Contract Totals: $8,496,495.85 $6,944,833.16 S0.00 $0.00 $0.00 <br /> N <br /> t-... <br />