Laserfiche WebLink
(21) Award construction contract and authorize the Mayor to sign the contract with IMCO <br /> General Construction, Inc. for the Replacement of Water Transmission Line No. 3 — <br /> Phase 7 Project in the amount of $6,174,996.00, including Washington State sales tax. <br /> (22) Award the Cougar Timber Sale #124-8 contract to the highest most responsive bidder, <br /> Hampton Tree Farms, Inc., and authorize the Mayor to sign the contract with this <br /> company for the amount of $ 998,191.24. <br /> (23) Award the 2011 Backwash Solids Dredging, Dewatering and Management Project <br /> contract to the lowest responsive bidder, Synagro West LLC and Authorize the Mayor to <br /> sign the contract with Synagro West, LLC in the amount of $408,408.00 <br /> (24) Authorize award of the construction contract for the 2011 Pavement Marking Project to <br /> Stripe Rite, Inc., of Sumner, WA, in the amount of $61,364.00 <br /> Executive Session <br /> Adjourn <br /> Everett City Council agendas can be found, in their entirety, on the City of Everett <br /> Web Page at www.ci.everett.wa.us utilizing the City Services dialog box, and <br /> selecting City Council. <br /> Everett City Council meetings are recorded for rebroadcast on government-access <br /> cable Comcast Channel 21 and Frontier Channel 29 at 12:00 p.m. on Monday and <br /> Tuesday; 2 p.m. and 7:00 p.m. Thursday; 7 p.m. Friday and Sunday; 10:00 a.m., <br /> Saturday. <br /> The City of Everett does not discriminate on the basis of disability in the admission <br /> or access to, or treatment in, its programs or activities. Requests for assistance or <br /> accommodations can be arranged by contacting the Everett City Council Office at <br /> 425 257-8703. <br />