Laserfiche WebLink
ATTACHMENT B — continued <br />9. Any area that does not comply with the specifications will be re -hydro seeded. <br />10. Conduct selected grading at the top of the slope to promote surface water drainage to the quarry <br />spall spillways. <br />11. If additional erosion has occurred since issuing the memo, those areas should also be repaired. <br />12. The City will provide OliverMcMillan notice prior to the repairs commencing to allow OliverMcMillan <br />to observe that the repairs are acceptable prior to the contractor leaving the site. <br />13 <br />