My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/06/15 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/06/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:22:28 AM
Creation date
5/3/2017 10:15:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acknowledge that City has determined that it will likely proceed with the construction of the <br />Roundabout and 41" Extension during Summer 2011. <br />b. Substantial Completion of Roundabout and 41s` Street Extension. The <br />deadlines under the PDA for the City to substantially complete construction of the Roundabout <br />and 41 s` Street Extension are amended as follows: <br />(1) Roundabout. .Developer shall use commercially reasonable <br />judgment to determine on what date development of the Landfill Site or the Simpson Site will <br />require the substantial completion of the Roundabout (this date, the "Roundabout Deadline"). <br />When Developer determines the Roundabout Deadline, Developer shall deliver a notice to the <br />City stating the Roundabout Deadline (the "Roundabout Notice"). The City shall substantially <br />complete the Roundabout by the later of (a) the Roundabout Deadline or (b) the date that is <br />sixteen (16) months after delivery of the Roundabout Notice. <br />(2) 41s` Extension. Developer shall use commercially reasonable <br />judgment to determine on what date development of the Simpson Site will require the substantial <br />completion of the 41" Extension (this date, the "41s` Street Extension Deadline"). When <br />Developer determines the 41s` Street Extension Deadline, Developer shall deliver a notice to the <br />City stating. the 41" Street Extension Deadline (the "4Is` Extension Notice"). The City shall <br />substantially complete the 41" Street Extension by the later of (a) the 41 Street Extension <br />Deadline or (b) the date that is sixteen (16) months after delivery of the 41S` Street Extension <br />Notice. <br />C. Paving. With respect to the Roundabout and the 41" Street Extension, the <br />PDA is amended so that the City at its cost will construct in accordance with the 2011 <br />Construction Drawings the full depth of roadway cross section except for the upper 1.5 inches of <br />asphalt pavement. The upper 1.5 inches of asphalt pavement on the Roundabout and 41" Street <br />Extension will be at the Developer's cost and will be completed by Developer. Prior to <br />Developer's starting work on the upper 1.5 inches of asphalt pavement, the City shall be <br />responsible for any repairs to the roadway cross section installed by the City to the extent such <br />repairs have not been necessitated by the actions of the Developer or Developer's contractors, <br />agents, lessees or invitees or by the actions of any Property owner or any Property owner's <br />contractors, agents, lessees or invitees. Prior to Developer starting work on the upper 1.5 inches <br />of asphalt, Developer will give the City a reasonable opportunity to inspect the condition of the <br />roadway cross section as installed by the City. <br />d. Abutment Surcharge. The City will deliver about 16,350 yards of gravel <br />barrow abutment surcharge material from the Roundabout and 41" Street Extension project to a <br />mutually agreed location within the Simpson Site. This delivery is at the City's cost and will be <br />completed no later than the date of completion of the 41" Street Extension. Upon delivery, <br />(i) the abutment surcharge material is the property of Developer and (ii) except for any City <br />obligations regarding hazardous materials that may be contained in the PDA or other agreements <br />between the City and Developer, the City has no further obligations regarding the abutment <br />surcharge material. <br />_2.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.