Laserfiche WebLink
SECTION 3::PROJECT:NEED AND SOLUTION <br /> This section includes a series of questions related to the need for the project and the proposed solution to the problem. <br /> Have thorough and complete responses. <br /> Attach any verifying information if necessary to clarify the degree of the problem(i.e., regulatory orders, negotiated letters <br /> of agreement, etc.). <br /> This is the applicant's opportunity to state the problem and its impact on the community. <br /> The information below states the Program's priorities, which are used to recommend projects for funding. <br /> • The program priority in which they fall, <br /> • Need assessment, <br /> • How well the situation is documented, and <br /> • How well the proposed solution addresses the problem. <br /> 1. Public health and safety <br /> 2. Environmental health <br /> Program 3. System performance <br /> Priorities: Re•air/Re•lacement <br /> 4. Growth I Economic <br /> • Develo•ment <br /> SEVERE • Project is to fix systems that have failed, are in imminent <br /> SITUATION danger of failing, and/or are currently out of regulatory <br /> compliance (under an active regulatory order); <br /> • An economic opportunity has presented itself provided that <br /> CHANCE the local government improves infrastructure to enable the <br /> OPPORTUNITY opportunity. <br /> • The project is being done to meet emerging regulatory <br /> Assessing requirements and/or the project is being done to bring a non- <br /> Need' MODERATE compliant(but not under regulatory order) system up to <br /> • existing standards; <br /> • Local government is improving the local business climate for <br /> future business ex•ansion <br /> • Project is necessary for the repair or replacement(end of <br /> POTENTIAL/ lifecycle) <br /> PREVENTATIVE • Project is being done to enable potential opportunities for <br /> •rowth and/or economic develo•ment <br /> SEVERE • Court orders <br /> SITUATION • Official regulatory orders <br /> —or— <br /> CHANCE • <br /> Negotiated agreement with an external agency <br /> • • A letter of commitment/intent from a business <br /> OPPORTUNITY <br /> Supporting • External agency is driving the project/timeline <br /> Documentation: MODERATE • Project specific formal studies and/or reports (either from an <br /> internal or external source) <br /> • A letter of interest from a business <br /> POTENTIAL/ • Internal monitoring <br /> PREVENTATIVE • Awareness of a problem <br /> SEVERE <br /> SITUATION • Solution clearly solves the problem <br /> —or— • Solution clearly meets the need <br /> CHANCE <br /> Proposed OPPORTUNITY <br /> Solution MODERATE • Solution does not solve the entire problem or fully address <br /> the need <br /> POTENTIAL/ • Solution does not meet the problem or the need <br /> ••PREVENTATIVE <br /> Fiscal Year 2013 Public Works Trust Fund Loan Application 13 Page 9 <br />