My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/07/20 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/07/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 11:31:48 AM
Creation date
5/3/2017 11:30:59 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 6/24/2011 City of Everett-Public Works Department Cutoff Date: 6/10/2011 <br /> Time: 8:59 AM Contract Estimate Voucher <br /> Project: 270 For Work Order#3382 Contractor: Totem Electric of Tacoma,Inc. <br /> Estimate#1 <br /> 112th Street Safety Improvement Project PO Box 1093 <br /> WO 3382 BID:$62,346.00 Tacoma,WA 98401-1093 <br /> TOTAL BID:$62,346.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 6,279.00 1.00 1.0000 0.0000 1.0000 6,279.00 0.00 6,279.00 <br /> 0002 SPCC Plan LS 574.00 1.00 1.0000 0.0000 1.0000 574.00 0.00 574.00 <br /> ,003 Flaggers and Spotters HR 42.00 40.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> .0004 Reimbursement for Third Party Damage EST 4,000.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0005 Priv.Impvmnt Restoration and Other EST 4,000.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 1„r Improvements <br /> r.r0006 Project Temporary Traffic Control LS 1,798.00 1.00 1.0000 0.0000 1.0000 1,798.00 0.00 1,798.00 <br /> 0007 LED R10-15 Blank-Out Sign EA 5,443.00 1.00 1.0000 0.0000 1.0000 5,443.00 0.00 5,443.00 <br /> 0008 Vehicle Video Detection System LS 36,572.00 1.00 1.0000 0.0000 1.0000 36,572.00 0.00 36,572.00 <br /> 0009 Erosion/Water Pollution Control EST 2,000.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> Work Order Totals: 50,666.00 0.00 50,666.00 <br /> 0A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.