Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Fiscal Year 2012 Public Works Action Originating Department Public Works <br /> Trust Fund Loan Application First Reading Contact Person Dave Davis <br /> for the Everett Water Pollution Second Reading Phone Number (425) 257-8800 <br /> Control Facility Expansion, Third Reading FOR AGENDA OF July 13, 2011 <br /> Phase C. Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Everett Water Pollution Loan Application Legal, Admin <br /> Control Facility on Smith <br /> Island <br /> Amount Budgeted $56,000,000 <br /> Expenditure Required $56,000,000 Account Number(s): UP3412-11-650 <br /> Budget Remaining $0 Everett WPCF Expansion, Phase C <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Public Works Department wishes to apply for a low-interest Washington State Public Works Trust Fund <br /> Loan to facilitate funding of the Phase C Expansion at the Everett Water Pollution Control Facility. The <br /> project's construction scope will include 1 trickling filter, additional contact basin channel, 1 secondary <br /> clarifier, 1 new pump at the south of the effluent station, 1 anaerobic digester and modifications to the north <br /> effluent station. The project is estimated to cost $56.0 Million. Of the $56.0 Million, the loan will provide <br /> $10,000,000 and the balance of$46,000,000 will come from local revenue and wholesale contributions. The <br /> terms of the loan are 0.5% interest rate for a 20-year term with a minimum local match of 15%. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the 2012 Public Works Trust Fund Loan Application for Everett Water <br /> Pollution Control Facility Expansion, Phase C. <br /> 44 <br />