Project: 2011 Pavement Marking Project
<br /> 1 3 Change Order No. 1
<br /> Change Order Effective Date: July 5, 2011
<br /> C
<br /> d xy<� � i'f'd Y 3
<br /> �4 4^� i:&` k a+.:. "i_�i"5i 4 V- -''y 3 CfgA V...",3,'^ E s }..`i . y a Y�c+k Z,Pi-zih'S }+�^�" zs �v'` iC, R. 14 ""''c„>
<br /> �-.� � r' z '��5�t��tt'�.,,�tx`�` �F��� '�$` ` :�. i-�+�'G �"��"'��- �- '�t�-°4 �� '�� M r� s 3 +k•��
<br /> A1W; :,P,.`. . t,. x {.s ,t,i_ 3a 4't., . A. �;f1 'z: .,;i"5__ ; ;, 4 1 ''',"' z x,i '' '�,',L'W Y, Jr",.-:,, ;n� 3,
<br /> s.a
<br /> %
<br /> f
<br /> By Date: RIZ/7'
<br /> Officer
<br /> Exhibit A—Description of Changed Work:
<br /> Modified Bid Items Change Order#1 modifies 3 existing bid items to the contract as listed below.
<br /> Item#6—24" Cross Walk. Modify the bid item entitled, "24"Cross Walk", at the unit price of
<br /> $3.25/LF, for a quantity increase of 5,103 lineal feet of 24" Cross Walk, for a total contract price
<br /> increase of$16,584.75.
<br /> Item #7—24" Stop Bar. Modify the bid item entitled, "24" Stop Bar", at the unit price of$4.25/LF,
<br /> for a quantity increase of 1,519 lineal feet of Plastic Line, for a total contract price increase of
<br /> $6,455.75.
<br /> Item#10—Plastic Line. Modify the bid item entitled, "Plastic Line", at the unit price 6f$0.55/LF, for
<br /> a quantity increase of 36,830,000 lineal feet of Plastic Line, for a total contract price increase of
<br /> $20,256.50.
<br /> The total price increase cost as a result of modifying these 3 existing bid items is $43,297.00.
<br /> Exhibit B —Justification:
<br /> Item#6—24" Cross Walk. This bid item is being modified to pay for additional 24"Cross Walk, as
<br /> ordered by the engineer. This work will be measured and paid for on a lineal foot basis.
<br /> Item #7—24" Stop Bar. This bid item is being modified to pay for additional 24" Stop Bar, as
<br /> ordered by the engineer. This work will be measured and paid for on a lineal foot basis.
<br /> Item#10 —Plastic Line. This bid item is being modified to pay for additional Plastic Line, as ordered
<br /> by the engineer. This work will be measured and paid for on a lineal foot basis.
<br /> Exhibit C—Additional Contract Time
<br /> There will be 0 additional working days added as a result of this change order.
<br /> Page3of3 80