Laserfiche WebLink
Run Date: 7/19/2011 City of Everett-Public Works Department Cutoff Date: 7/8/2011 <br /> Time: 9:58 AM Contract Estimate Voucher <br /> For Work Order#3289B Contractor: Kamins Construction <br /> Project:265 Estimate#4FINAL <br /> 7th Ave Pedestrian&Bicycle Safety and 19315 Ross Road <br /> 92nd St Pedestrian Walkway <br /> WO 3289B BID:$6,000.00 Bothell,WA 98011 <br /> TOTAL BID:$516,576.28 . <br /> Total Amt Previous Amt Present Amt <br /> i--+ Contract Totals to Date $6,000.00 $6,000.00 $0.00 <br /> Retained Amounts $300.00 $300.00 $0.00 <br /> • <br /> State Tax Amounts $0.00 : $0.00 $0.00 <br /> Amounts Paid $5,700.00 $5,700.00 <br /> Amount to be Paid This Estimate $0.00 <br /> Checkedy a Date "7/(f r( <br /> K` � 7 / - —— <br /> Recommended By „y._,.r__ ,.__ Date 7/ <br /> Public Works Director 1 / • <br /> _- _ Date �,.�_ .l L_ ___ <br /> RECORD DRAWING CHECKI FF <br /> Inspocter:_e'lliCe‹-K }AT`L----.—. Dat,i: /ZC'r f W <br /> Contractor: Dale: <br /> Work Order Number:3289B <br />