My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:32:58 AM
Creation date
5/5/2017 9:32:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 7/19/2011 City of Everett-Public Works Department Cutoff Date: 7/8/2011 <br /> Time: 9:58 AM Contract Estimate Voucher <br /> For Work Order#3289B Contractor: Kamins Construction <br /> Project:265 Estimate#4FINAL <br /> 7th Ave Pedestrian&Bicycle Safety and 19315 Ross Road <br /> 92nd St Pedestrian Walkway <br /> WO 3289B BID:$6,000.00 Bothell,WA 98011 <br /> TOTAL BID:$516,576.28 . <br /> Total Amt Previous Amt Present Amt <br /> i--+ Contract Totals to Date $6,000.00 $6,000.00 $0.00 <br /> Retained Amounts $300.00 $300.00 $0.00 <br /> • <br /> State Tax Amounts $0.00 : $0.00 $0.00 <br /> Amounts Paid $5,700.00 $5,700.00 <br /> Amount to be Paid This Estimate $0.00 <br /> Checkedy a Date "7/(f r( <br /> K` � 7 / - —— <br /> Recommended By „y._,.r__ ,.__ Date 7/ <br /> Public Works Director 1 / • <br /> _- _ Date �,.�_ .l L_ ___ <br /> RECORD DRAWING CHECKI FF <br /> Inspocter:_e'lliCe‹-K }AT`L----.—. Dat,i: /ZC'r f W <br /> Contractor: Dale: <br /> Work Order Number:3289B <br />
The URL can be used to link to this page
Your browser does not support the video tag.