My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:32:58 AM
Creation date
5/5/2017 9:32:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION 3 <br /> Project: 7th Ave. Pedestrian/Bicycle Safety and 92nd St. Pedestrian Walkway <br /> Contractor: Kamins Construction <br /> Work Order No. PW3289 and UP3271 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> / it/ litO sE% i( <br /> Public Works I irector Date <br /> Dave Davis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk <br /> Sharon Marks <br /> APPROVED AS TO FORM <br /> By: <br /> Jim Iles, City Attorney <br /> Date <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.