My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/14 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:11:10 AM
Creation date
5/5/2017 10:10:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Exhibit B: System Description <br /> a. Location <br /> i. Carl Gipson Senior Center <br /> ii. 3025 Lombard Avenue Everett, WA 98201 <br /> iii. Owned by the City of Everett <br /> b. Size <br /> i. Total system size: minimum 4.17 kW <br /> c. Site Diagrams <br /> i. Figure A—Aerial image <br /> ii. Figure B— Photo mock-up <br /> iii. Figure C—Room diagram <br /> iv. Figure D—Simple single line diagram <br /> d. Interconnection <br /> i. Grid connected <br /> ii. Net meter—provided by Snohomish County PUD <br /> iii. PV Energy Production meter—provided by Snohomish County PUD <br /> e. Mounting system —provided by Contractor <br /> i. Racking to be determined by contractor <br /> ii. Tilt: 30-33 degrees from horizontal <br /> iii. Orientation: 154 degrees from south <br /> iv. Theft resistant fasteners <br /> f. PV Modules—provided by Contractor <br /> i. (17) Solar World, SW-245 Mono, 245W DC Output PV modules <br /> ii. Mounted on Southeastern exterior wall <br /> g. Inverter—provided by Contractor <br /> i. Enphase, (17) M215 micro inverters <br /> ii. Microinverters shall be located on the back of each PV module <br /> h. Balance of Systems-provided by Contractor <br /> i. Production meter base located on south eastern side of building at ground level <br /> ii. UV resistant DC wiring to junction box(es) or combiner(s), located at solar panel installation <br /> iii. Array grounding hardware, as required by 690.47 <br /> iv. All array mounting hardware/fasteners to make the PV system code compliant, operational <br /> and secure <br /> v. AC wiring, conduit and fittings between microinverter junction box to AC production meter <br /> vi. AC wiring, conduit and fittings from AC production meter to electrical sub-panel K <br /> vii. AC wiring, conduit and fittings from electrical sub-panel K to Power-One Aurora Universal <br /> enclosure <br /> viii. All electrical components, fittings, hardware and fasteners required in order for system to be <br /> operational and compliant with NEC and local authority having jurisdiction (AHJ). <br /> 58 Page 9of14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.