My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/14 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:11:10 AM
Creation date
5/5/2017 10:10:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> H. Dedicated Distribution Transformer. <br /> To ensure reliable service to all PUD customers and to minimize possible problems for other customers, <br /> the PUD will review the need for a dedicated-to-single-customer distribution transformer. Interconnecting gen- <br /> eration under 100 kW may require a separate transformer. If the PUD requires a dedicated distribution trans- <br /> former,the Customer shall pay for all costs of the new transformer and related facilities. <br /> I. Metering <br /> Net Metering for Solar, Wind, Hydropower and Fuel Cells as set forth in RCW 80.60: The PUD shall <br /> install, own and maintain a kilowatt-hour meter, or meters as the installation may determine, capable of register- <br /> ing the bi-directional flow of electricity at the Point of Common Coupling at a level of accuracy that meets all <br /> applicable standards, regulations and statutes. The meter(s) may measure such parameters as time of delivery, <br /> power factor, voltage and such other parameters as the PUD shall specify. The customer shall provide space for <br /> metering equipment. It will be the customer's responsibility to provide the current transformer enclosure (if re- <br /> quired),meter socket(s) and junction box after the customer has submitted his/her drawings and equipment spe- <br /> cifications for PUD approval. The PUD may approve other generating sources for net metering but is not re- <br /> quired to do so. <br /> Production Metering: The PUD may require separate metering for production. This meter will record all <br /> generation produced and may be billed separately from any net metering or customer usage metering. All costs <br /> associated with the installation of production metering will be paid by the customer. <br /> J. Labeling. <br /> Common labeling furnished or approved by the PUD and in accordance with NEC requirements must be <br /> posted on meter base,disconnects, and transformers informing working personnel that generation is operating at <br /> or is located on the premises. <br /> K. Insurance & Liability <br /> As currently set forth for qualifying generation under RCW 80.60, for solar, wind, hydro or fuel cells no <br /> additional insurance will be necessary. For other generation facilities permitted under these standards but not <br /> contained within RCW 80.60, additional insurance and indemnification may be required. Qualifying generation <br /> must meet these interconnection standards and maintain compliance with these standards during operation. <br /> L. Future Modification or Expansion. <br /> Prior to any future modification or expansion of the customer-owned generating facility, the customer <br /> will obtain PUD review and approval. The PUD reserves the right to require the customer, at the customer's ex- <br /> pense, to provide corrections or additions to existing electrical devices in the event of modification of govern- <br /> ment or industry regulations and standards. <br /> M. PUD System Capacity <br /> For the overall safety and protection of the PUD system, RCW 80.60 currently limits interconnection of <br /> generation for net metering to 0.25% of the PUD's peak demand during 1996. Additionally, interconnection of <br /> qualified customer-owned generation to individual distribution feeders will be limited to 10% of the feeder's <br /> peak capacity. However, the PUD may, in its sole discretion, allow additional generation interconnection <br /> beyond these stated limits. <br /> N. Customer-Owned Equipment Protection <br /> It is the responsibility of the customer to protect their facilities, loads and equipment and comply with <br /> Snohomish County PUD Net Metering Agreement Rev.4/201110 <br /> 10 <br /> Reviewed: ALS 6-27-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.