Laserfiche WebLink
7 <br /> been successful in securing federal funds for engineering and construction to replace the <br /> deteriorated Bridge structure. <br /> Per City of Everett directive, TranTech assembled a team to perform an Alternative Study Report <br /> (i.e., Phase I design) for the Broadway Bridge Replacement Project. TranTech's team completed <br /> the aforementioned Report in August 2011. <br /> Recently, the City has requested TranTech's team to provide a Scope and Budget for Phase II <br /> design of the Project which will advance the Project to Full Design level. Phase II services will <br /> also include Bid Support tasks. <br /> TranTech's team is composed of the following consultants: <br /> Perteet, Inc—Survey/Roadway/Traffic/Civil/Permitting/Public Involvement <br /> Hong West and Associates—Geotechnical and Hazmat <br /> Makers, Inc—Urban Design and Aesthetics <br /> Murray, Smith and Associates, Inc.—Utility design and Coordination <br /> Ott Construction Consultants—Constructability and Estimation <br /> MCR—BNSF Coordination <br /> TranTech—Project Management/ Structural <br /> 34 <br />